
A two-storey mezzanine and pallet racking have been recently installed at a customer in the plumbing and heating sector, all in accordance with current anti-seismic regulations.
The collaboration between the customer’s engineering office and that of Bftm has allowed the optimization of the available surface in the new shed, built adjacent to the existing one.
The two-storey mezzanine, each of about 300 square meters, will be used as a warehouse. The construction is enslaved by a staircase and two swing gates have been provided. The material will also be brought to the floors by means of a freight elevator.
The canopy was built along the entire length of three facades of the shed to protect the doors and loading / unloading areas.
For over 40 years we have been experts in providing “turnkey” solutions for every need of warehouse and goods storage: look at some projects that we have implemented over the years (visit the “realizations” page) >>>
Do you need to reorganize your warehouse?
Contact us: one of our sales technicians will be at your disposal to find the best solution to your needs.